Reference

Complex elaboration of project documentation according to Ministry of Transport directives on documentation of aboveground motorways.

I/59  The bridge over Olše river in Karviná

Investor: Road and Motorway Directorate of the Czech Republic
Contractor: FIRESTA - Fišer, rekonstrukce, stavby, a.s.
Structure realization: 2010 - 2011
Compiled levels of PD: DSP 2010, RDS 2011

Highway I/47, Northern connection, First construction

Investor: Road and Motorway Directorate of the Czech Republic
Contractor: ODS – Dopravní stavby Ostrava a.s
Structure realization: 2006 - 2008
Compiled levels of PD: Study 1993,  DSP 2004, RDS 2006-7

Revitalization of peripheral expressway in Urban Monument Zone Místek

Investor: Corporate town Frýdek - Místek
Contractor: ODS – Dopravní stavby Ostrava a.s
Structure realization: 2009
Compiled levels of PD: DSP 2008, RDS 2009

I/11 and I/56 highways interconnection, junction S1 in Opava

Investor: Road and Motorway Directorate of the Czech Republic
Contractor: Company association of SKANSKA DS a.s. -  BÖGL a KRÝSL k.s
Structure realization: 2008 - 2010
Compiled levels of PD: Study 2001, DÚR 2003, DSP 2004, RDS 2008-9

Highway I/11 Český Těšín, by-pass highway

Investor: Road and Motorway Directorate of the Czech Republic
Contractor: ODS Dopravní stavby Ostrava a.s
Structure realization: 2006 - 2008
Compiled levels of PD: Study 1995, DÚR 2001, DSP 2003, RDS 2006-7

Highway D47, structure 4708,2 Ostrava Rudná - Hrušov - grade-separated junction Rudná

Investor: Road and Motorway Directorate of the Czech Republic
Contractor: ODS Dopravní stavby Ostrava a.s
Structure realization: 2004
Compiled levels of PD: DÚR  1996, DSP 2001, RDS 2003-5

III/04720 - Přerov, Plant bridge

Investor: Olomouc region
Contractor: FIRESTA - Fišer, rekonstrukce, stavby, a.s.
Structure realization: 2005 - 2007
Compiled levels of PD: DSP 2003, RDS 2005-6

Highway I/56 Ostrava - extended Místecká - first and second structure

Investor: Road and Motorway Directorate of the Czech Republic
Contractor: Company association of Metrostav a.s. - Strabag a.s. - BÖGL a KRÝSL k. - FIRESTA - Fišer, rekonstrukce, stavby a.s.
Structure realization: 2008 - 2011
Compiled levels of PD: DSP 2004, RDS 2011

Highway II/492 Luhačovice, crossing with highway III/4922

Investor: Road and Motorway Directorate of Zlín region
Contractor: Strabag  a.s.
Structure realization: 2006
Compiled levels of PD: IZ 2002, DÚR a DSP 2005, RDS 2006

Reconstruction of bridge over Sola river in Kobiernice, Poland

Investor: Road and Motorway Directorate of Poland
Contractor: FIRESTA - Fišer, rekonstrukce, stavby a.s.
Structure realization: 2010-2011
Compiled levels of PD: RDS 2010

Highway I/48 and I/47 Bělotín; grade-separated junction with Czech railways

Investor: Road and Motorway Directorate of the Czech Republic
Contractor: SKANSKA DS a.s.
Structure realization: 2004
Compiled levels of PD: DÚR 1994, DSP 1998

Highway I/38 Moravské Budějovice - highway by-pass

Investor: Road and Motorway Directorate of the Czech Republic
Contractor: Company association of Strabag a.s. – Eurovia a.s.
Structure realization: 2008 - 2010
Compiled levels of PD: DÚR 2002, DSP 2004, RDS 2009-2010